REQUEST FOR QUOTES (RFQ) FOR THE SUPPLY OF SERVICE- BOREHOLE REHABILITATION
“RFQ N0: EYNPN/CAID/WASH/MAFA/TENDER/AUGUST/2025/0394 “REHABILITATION OF BOREHOLES”
CLOSING DATE: 23rd October 2025, 5:00 PM
LOCATION: MAFA LGA AND NGWOM, BORNO STATE
ITEM / DISCRIPTION
UNIT
QUANTITY
Rehabilitation of Borehole 1 at Ngwom as on Bill of Quantity attached
Each
1
Rehabilitation of Borehole 2 at Mafa Central Primary School as on Bill of quantity attached
Each
1
Rehabilitation of Borehole 3 at Mafa as on Bill of Quantity attached
Each
1
To be considered, bidders should submit a complete quotation not later than the closing date and time indicated above. Bidders should ensure that the quotation is well written in English, easy to read, follows the instructions provided, and contains only requested information.
QUESTION: Any questions should be submitted in writing and emailed to procurements@eynprojects.orgno later than two days after the issue date of this RFQ. No questions will be entertained if they are received by means other than the specified email address, and any communications to alternate e-mail addresses will result in the disqualification of the bidder. The solicitation number (listed above) should be stated in the subject line. Answers will be compiled and distributed within 1 day from the closing date of questions
The Bidder is required to include details of three business references; this should include the name, company, and relationship to the bidder, email address, and / or phone number for each reference.
EYN Projects reserves the right to visit the place of business of a prospective supplier to verify that it is a legal business entity and has the necessary organizational and management competence to fulfill the necessary responsibilities.
All Bidders must provide proof of registration and tax. Attach CAC certificate, TIN Certificate and updated Tax Clearance Certificate when sending quotation.
All transportation and handling charges if any should be incorporated into vendor’s quoted unit price.
DISCLAIMER: - Brand Names: Specific brands and / or models indicated—while often preferred—are for description only. An equivalent substitute, as determined by the specifications, will be acceptable.
The EYN projects estimates that the Borehole rehabilitation will be completed within a period of 10 working days. The selected bidder(s) should have the capacity to rehabilitation needed by EYN projects within the aforementioned timeframe. The consumption range provided is an estimate, and EYN projects reserves the right to consume above or below this range, or to order partial Items, and the selected bidder(s) shall deliver accordingly. The selected bidder(s) must deliver the Service according to the provided timeline.
TENDER REQUIREMENTS: - To ensure that best value is obtained the following would be considered;
Evidence of Vendor’s registration with CAC, Tax Identification number and updated Tax Clerance (Certificates) and other relevant certificates-SCUML
Acceptable quotation validity period
Availability of items
Delivery within specified time
Proof of experience
three business references; this should include the name, company, and relationship to the bidder, email address, and / or phone number for each reference.
Quotation is applicable to 2% withholding tax and 1% Stamp duty.
EVALUATION CRITERIA: BEST VALUE (Technical Specification 40%, Delivery Time 30%, Price reasonableness 30%): - Only quotations that meet the requirement above would be selected for evaluation. Please note that if there are significant deficiencies regarding responsiveness to the requirements of this RFQ, an offer may be deemed “non-responsive” and thereby disqualified from consideration. EYN Projects reserves the right to waive immaterial deficiencies at its discretion. EYN and its Donor reserves the right to access vendor’s procurement document in case of any misconduct
BOQ FOR THE REHABILITATION OF NGWOM SOLAR POWERED BOREHOLE IN MAFA LGA, BORNO STATE, NIGERIA.
DESCRIPTION OF WORKS
UNIT
QUANTITY
COST
TOTAL COST
1
Mobilization and Demobilisation (Establishment of a base Station): Mobilization of all necessary materials, equipment, and all personnel to the base station for site clearance, borehole developments, pumping test and recovery tests, civil works, and installation of motorized pumps; including demobilisation of all Plants, Equipment's and all resources from sits upon completion of installation works.
Lumpsum
1
2
Allow for data analysis and writing reports (Borehole completion reports, pump test report, installation report) in two hard copies and 1 electronic copy.
Lumpsum
1
Total carried to summary: MOBILIZATION
CONSTRUCTION OF WATER COLLECTION POINT_WITH RAMP AND RAIL
A
EARTH WORK
1
Site Clerance: Clear and and remove all tres, shrubs, and obstacle to be disposed 100m away from the site.
m2
24.5
2
Excavate for the Foundation to receive concrete work not exceeding 700mm depth
m3
5.23
3
Backfilling to the sides of the excavated foundation footing using selected excavated materials to achieve maximum campaction ratio.
m3
1.87
4
Remove surplus excavated material away from the site
m3
0.93
5
Excavation of soak pitnot exceeding 1.5m from natural ground level as specified on the drawings
m3
17.85
6
Provide hardcore material to the floor site of the water point
m2
9.4
SUBTOTAL
B
CONCRETE WORK
1
Provide and place 50mm thick plain concrete to ratio 1:3:6 grade 10 for foundation trench as specified on the drawing and specification.
m3
0.85
2
Plastering/Rendering of water point using ratio 1:3
m2
11.25
3
Ditto: Apron
m3
5.66
4
Provide mass cocrete to the ramp using ratio 1:3:6
m3
0.27
5
Reinforced concrete cover slab to ratio 1:2:4 grade 15
m3
0.26
6
Ditto: Apron
m2
0.5
SUBTOTAL
C
REINFORCEMENT
1
High yield steel deformed bars to BS4449
2
Provide and fixed Y 12mm Ø reinforcement bar for soak pit slab
Kg
37
3
Binding wire
Kg
1
SUBTOTAL
D
FORMWORK
1
Provide 2"x4" hard wood timber to the sides of slab
pcs
4.80
2
3" assorted nails
kg
1.00
SUBTOTAL
E
MASONRY WORK
1
Provide and lay 230mm thick hollow blocks of 1:3 mix ratio enbedded and jointed to cement sand mortar(1:4) to the perimeter and Apron of the water point ncluding ramp and 3 metre drainage channel connecting collection point and soak pit
m2
17.92
2
Sand cement plastering/rendering of 20mm thick, finished smooth: To internal & external fence walls.
m2
12.87
3
Provide and lay 230mm thick hollow blocks of 1:3 mix ratio enbedded and jointed to cement sand mortar(1:4) to the soak pit allowing maximum of 3 opening to sides od the pit for proper seapage
m2
14.20
4
50mm thick concrete blinding to ratio 1:3:6 grade 10 for soak pit
m3
0.31
5
Block fill the block using week concrete
m3
2.24
SUBTOTAL
F
STEEL WORK
1
Provide and fixed 1 1/4" diameter pure black circular hand rail to the both sides of the ramp as shown on the drawing
m
29.20
SUBTOTAL
F
Plumbing work
1
Provide and fix UPVC 1" UPVC tigger elbow
Nr
2
2
Provide and fix 3/4" steel tap head England made or as specified by the engineer
Nr
6
3
Provide and fix 3/4" UPVC tigger nipple
Nr
6
4
Provide and fix 3/4" UPVC tigger socket
Nr
6
5
Provide and fix 1" by 3/4" Bushing England made or as specified by the engineer
Nr
6
6
Provide and fix 1" UPVC tigger pipe in the collection point and extend aleast 2m away from the collection point
Nr
2
7
Provide and fix 1" UPVC stop cork regulator at the collection point
Nr
1
SUBTOTAL
Total carried to summary - CONSTRUCTION OF WATER COLLECTION POINT_WITH RAMP AND RAIL
Total carried to summary - CONSTRUCTION OF WATER COLLECTION POINT_WITH RAMP AND RAIL FOR 2 UNITS
2
BOQ: For Solar Installation 1,150 Watts System
1
Supply and Install pump type SQ flex (1.5 Hp) determined by yield and depth of installation
Set
1
2
Solar Panels 250watts
Set
8
4
Supply & Install Support Structure and frame for panels as in TSS
NR
1
5
Supply and Install 3X6mm2 pump motor cables
Set
1
6
Supply and Install 4mm2 inter-connector cables
Set
1
7
Supply and Install High pressure 2" PVC riser piping (8bar) for pump installation
m
70
8
Supply and Install level switch
Set
1
7
Provide and fix 16mm Marine rope to secure the pump
meter
70
8
Provide or construct a chamber as protector at the well head to secure the pump from vandalIzation. This can be in form of concrete or steel as specified by the engineer
Lumpsum
1
9
Provide and install 6 feet copper earthen rod
Piece
1.0
10
Provide and install copper lightening arrester
Piece
1.0
11
Provide and fix 16mm lex of 15m length (made in Nigeria)
Roll
1.0
12
Provide and fix scrotch cast connection for the borehole cable
Piece
1.0
13
Provide and fix adjustable strap for cable tightening
pack
1.0
14
Provide and fix 16m cable lock
Piece
1.0
Sub Total
Anti-theft Mechanism on Wellbore
Item Description
Unit
Quantity
Rate
AMOUNT (N)
Tile
Metres
38
Over Head Tank 3000 Ltr
Litres
2
Sub Total Tiling
Summary - Mobilization
Summary - Construction of water collection point with ramp and rail for 2 units
Summary - Solar Installation 1,150 Watts System
Summary -Anti-theft Mechanism on Wellbore
Total
BOQ FOR THE REHABILITATION OF MAFA SOLAR POWERED BOREHOLE IN MAFA LGA, WULARI BORNO STATE, NIGERIA.
DESCRIPTION OF WORKS
UNIT
QUANTITY
COST
TOTAL COST
1
Mobilization and Demobilisation (Establishment of a base Station): Mobilization of all necessary materials, equipment, and all personnel to the base station for site clearance, borehole developments, pumping test and recovery tests, civil works, and installation of motorized pumps; including demobilisation of all Plants, Equipment's and all resources from sits upon completion of installation works.
Lumpsum
1
-
2
Allow for data analysis and writing reports (Borehole completion reports, pump test report, installation report) in two hard copies and 1 electronic copy.
Lumpsum
1
-
Total carried to summary: MOBILIZATION
CONSTRUCTION OF WATER COLLECTION POINT_WITH RAMP AND RAIL
A
EARTH WORK
1
Site Clerance: Clear and and remove all tres, shrubs, and obstacle to be disposed 100m away from the site.
m2
24.5
-
2
Excavate for the Foundation to receive concrete work not exceeding 700mm depth
m3
5.23
-
3
Backfilling to the sides of the excavated foundation footing using selected excavated materials to achieve maximum campaction ratio.
m3
1.87
-
4
Remove surplus excavated material away from the site
m3
0.93
-
5
Excavation of soak pitnot exceeding 1.5m from natural ground level as specified on the drawings
m3
17.85
-
6
Provide hardcore material to the floor site of the water point
m2
9.4
-
SUBTOTAL
-
B
CONCRETE WORK
1
Provide and place 50mm thick plain concrete to ratio 1:3:6 grade 10 for foundation trench as specified on the drawing and specification.
m3
0.85
-
2
Plastering/Rendering of water point using ratio 1:3
m2
11.25
-
3
Ditto: Apron
m3
5.66
-
4
Provide mass cocrete to the ramp using ratio 1:3:6
m3
0.27
-
5
Reinforced concrete cover slab to ratio 1:2:4 grade 15
m3
0.26
-
6
Ditto: Apron
m2
0.5
-
SUBTOTAL
-
C
REINFORCEMENT
1
High yield steel deformed bars to BS4449
2
Provide and fixed Y 12mm Ø reinforcement bar for soak pit slab
Kg
37
-
3
Binding wire
Kg
1
-
SUBTOTAL
-
D
FORMWORK
1
Provide 2"x4" hard wood timber to the sides of slab
pcs
4.80
-
2
3" assorted nails
kg
1.00
-
SUBTOTAL
-
E
MASONRY WORK
1
Provide and lay 230mm thick hollow blocks of 1:3 mix ratio enbedded and jointed to cement sand mortar(1:4) to the perimeter and Apron of the water point ncluding ramp and 3 metre drainage channel connecting collection point and soak pit
m2
17.92
-
2
Sand cement plastering/rendering of 20mm thick, finished smooth: To internal & external fence walls.
m2
12.87
-
3
Provide and lay 230mm thick hollow blocks of 1:3 mix ratio enbedded and jointed to cement sand mortar(1:4) to the soak pit allowing maximum of 3 opening to sides od the pit for proper seapage
m2
14.20
-
4
50mm thick concrete blinding to ratio 1:3:6 grade 10 for soak pit
m3
0.31
-
5
Block fill the block using week concrete
m3
2.24
-
SUBTOTAL
-
F
STEEL WORK
1
Provide and fixed 1 1/4" diameter pure black circular hand rail to the both sides of the ramp as shown on the drawing
m
29.20
-
SUBTOTAL
-
F
Plumbing work
1
Provide and fix UPVC 1" UPVC tigger elbow
Nr
2
-
2
Provide and fix 3/4" steel tap head England made or as specified by the engineer
Nr
6
-
3
Provide and fix 3/4" UPVC tigger nipple
Nr
6
-
4
Provide and fix 3/4" UPVC tigger socket
Nr
6
-
5
Provide and fix 1" by 3/4" Bushing England made or as specified by the engineer
Nr
6
-
6
Provide and fix 1" UPVC tigger pipe in the collection point and extend aleast 2m away from the collection point
Nr
2
-
7
Provide and fix 1" UPVC stop cork regulator at the collection point
Nr
1
-
SUBTOTAL
-
Total carried to summary - CONSTRUCTION OF WATER COLLECTION POINT_WITH RAMP AND RAIL
-
Total carried to summary - CONSTRUCTION OF WATER COLLECTION POINT_WITH RAMP AND RAIL FOR 2 UNITS
3
-
Anti-theft Mechanism on Wellbore
Item Description
Unit
Quantity
Rate
AMOUNT (N)
Tile
Metres
38
Solar Panels 250watts
Metres
4
Fencing
Lumosom
Lumpsom
Sub Total Tiling
-
Summary - Mobilization
Summary - Construction of water collection point with ramp and rail for 2 units
-
Summary -Anti-theft Mechanism on Wellbore
-
Total
-
BOQ FOR THE REHABILITATION OF MAFA 2 SOLAR POWERED BOREHOLE IN MAFA CENTRAL PRIMARY SCHOOL LGA, BORNO STATE, NIGERIA.
DESCRIPTION OF WORKS
UNIT
QUANTITY
COST
TOTAL COST
1
Mobilization and Demobilisation (Establishment of a base Station): Mobilization of all necessary materials, equipment, and all personnel to the base station for site clearance, borehole developments, pumping test and recovery tests, civil works, and installation of motorized pumps; including demobilisation of all Plants, Equipment's and all resources from sits upon completion of installation works.
Lumpsum
1
-
2
Allow for data analysis and writing reports (Borehole completion reports, pump test report, installation report) in two hard copies and 1 electronic copy.
Lumpsum
1
-
Total carried to summary: MOBILIZATION
CONSTRUCTION OF WATER COLLECTION POINT_WITH RAMP AND RAIL
A
EARTH WORK
1
Site Clerance: Clear and and remove all tres, shrubs, and obstacle to be disposed 100m away from the site.
m2
24.5
-
2
Excavate for the Foundation to receive concrete work not exceeding 700mm depth
m3
5.23
-
3
Backfilling to the sides of the excavated foundation footing using selected excavated materials to achieve maximum campaction ratio.
m3
1.87
-
4
Remove surplus excavated material away from the site
m3
0.93
-
5
Excavation of soak pitnot exceeding 1.5m from natural ground level as specified on the drawings
m3
17.85
-
6
Provide hardcore material to the floor site of the water point
m2
9.4
-
SUBTOTAL
-
B
CONCRETE WORK
1
Provide and place 50mm thick plain concrete to ratio 1:3:6 grade 10 for foundation trench as specified on the drawing and specification.
m3
0.85
-
2
Plastering/Rendering of water point using ratio 1:3
m2
11.25
-
3
Ditto: Apron
m3
5.66
-
4
Provide mass cocrete to the ramp using ratio 1:3:6
m3
0.27
-
5
Reinforced concrete cover slab to ratio 1:2:4 grade 15
m3
0.26
-
6
Ditto: Apron
m2
0.5
-
SUBTOTAL
-
C
REINFORCEMENT
1
High yield steel deformed bars to BS4449
2
Provide and fixed Y 12mm Ø reinforcement bar for soak pit slab
Kg
37
-
3
Binding wire
Kg
1
-
SUBTOTAL
-
D
FORMWORK
1
Provide 2"x4" hard wood timber to the sides of slab
pcs
4.80
-
2
3" assorted nails
kg
1.00
-
SUBTOTAL
-
E
MASONRY WORK
1
Provide and lay 230mm thick hollow blocks of 1:3 mix ratio enbedded and jointed to cement sand mortar(1:4) to the perimeter and Apron of the water point ncluding ramp and 3 metre drainage channel connecting collection point and soak pit
m2
17.92
-
2
Sand cement plastering/rendering of 20mm thick, finished smooth: To internal & external fence walls.
m2
12.87
-
3
Provide and lay 230mm thick hollow blocks of 1:3 mix ratio enbedded and jointed to cement sand mortar(1:4) to the soak pit allowing maximum of 3 opening to sides od the pit for proper seapage
m2
14.20
-
4
50mm thick concrete blinding to ratio 1:3:6 grade 10 for soak pit
m3
0.31
-
5
Block fill the block using week concrete
m3
2.24
-
SUBTOTAL
-
F
STEEL WORK
1
Provide and fixed 1 1/4" diameter pure black circular hand rail to the both sides of the ramp as shown on the drawing
m
29.20
-
SUBTOTAL
-
F
Plumbing work
1
Provide and fix UPVC 1" UPVC tigger elbow
Nr
2
-
2
Provide and fix 3/4" steel tap head England made or as specified by the engineer
Nr
6
-
3
Provide and fix 3/4" UPVC tigger nipple
Nr
6
-
4
Provide and fix 3/4" UPVC tigger socket
Nr
6
-
5
Provide and fix 1" by 3/4" Bushing England made or as specified by the engineer
Nr
6
-
6
Provide and fix 1" UPVC tigger pipe in the collection point and extend aleast 2m away from the collection point
Nr
2
-
7
Provide and fix 1" UPVC stop cork regulator at the collection point
Nr
1
-
SUBTOTAL
-
Total carried to summary - CONSTRUCTION OF WATER COLLECTION POINT_WITH RAMP AND RAIL
-
Total carried to summary - CONSTRUCTION OF WATER COLLECTION POINT_WITH RAMP AND RAIL FOR 2 UNITS
3
-
Anti-theft Mechanism on Wellbore
Item Description
Unit
Quantity
Rate
AMOUNT (N)
Tile
Metres
38
Solar Panels 250watts
Metres
4
Water Reticulation Pipe
pcs
90
Sub Total Tiling
-
Summary - Mobilization
-
Summary - Construction of water collection point with ramp and rail for 2 units
-
Summary -Anti-theft Mechanism on Wellbore
-
Total
-