Skills

  • Engineering

Experience

Paul Karemeri

Work experience
  • CURRENT STREET LIGHTING PROJECTS {Design and or Supervision}
  • 1) Kisumu Northern Bypass Road (Design Review and Supervision). {January 2019 - ongoing}
  • 2) Mombasa – Mtwapa – Kwa Kadzengo – Kilifi (A7) Road section (Design Review).
  • 3) Isabania – Kisii (A1) Road Section (Design Review).
  • 4) Missing Links Road and Non-Motorised Transport (NMT) Facilities in Nairobi – Kenya (Supervision)
  • 5) Mombasa Port Area Road Development Project Package 2 – Construction of Mwache Junction – Tsunza - Mteza section. (Supervision - ongoing)
  • 6) Mombasa Port Area Road Development Project Package 3 – Construction of Mteza – Kibundani Section (Supervision - ongoing)
  • 7) Busega – Mpigi Expressway (2 x 23.7 Km) road project – Street Lighting and Toll Gate Plazas (Offices) {Uganda} (Design Review) {July 2019}
  • 8) Construction of Second Carriageway of Athi River – Machakos Turnoff Section of Nairobi – Mombasa Road (A109) (Supervision - ongoing)
  • 9) Construction Supervision of Mombasa – Mariakani (A109) Highway Project Lot 1 – Mombasa – Kwa Jomvu Section (Supervision - ongoing)
  • 10) Preliminary and detailed engineering design of Maralal – North Horr Road, LOT1 – Maralal – Baragoi. – All in one LED street lighting. (Design Review) {October 2020 - ongoing}
  • 11) Construction of Non – Motorized Transport Facility - All in one LED street lighting, including lighting for public amenities:- i.e. public wash rooms and pedal cycle sheds within Kisumu City. (Design Review and Supervision) {November 2020 – December 2022}
  • 12) Upgrading of Kibwezi – Mutomo – Kitui – Kabati – Migwani (A9/B64) Road – Kitui Road side amenities – Lighting for parking area for buses and trucks with trailers. (Design and Supervision of 20M high mast flood lighting) {May 2021 - ongoing}
  • 13) Upgrading of Lodwar –Lokitaung Junction (A1) Road – Lot 1. (Supervision of street lighting and trucks parking area illumination) {August 2021 - ongoing}
  • 14) Preliminary and Detailed Engineering Design of Naivasha Road and Kikuyu Road - All in one LED solar street lighting, (Design Review) {September 2021 - ongoing}
  • 15) Establishment of the Bus Rapid Transport (BRT) Line 5 project (on outering road) - All in one LED solar street lighting on the B.R.T and lighting and power distribution for the bus stations and B.R.T depot (Preliminary and Detailed Design and supervision) {June 2022 - ongoing}
  • 16) Upgrading and landscaping of Kenyatta road (C565) - All in one LED solar street lighting. (Preliminary and Detailed Engineering Design and supervision) {March 2022 – ongoing}
  • ENERGY AUDIT STUDY PROJECTS
  • 1) Infrared thermo imaging inspection for CISCO Systems Management B.V Offices at Landmark Plaza 7th Floor. {Annually from 2019 – 2022} – Using FLUKE Ti 32 Thermo Imager.
  • 2) Infrared thermo imaging inspection for SYNGENTA East Africa Limited offices, Located on Avenue 5 Building Wing A, Rose Avenue, 6th Floor, Nairobi, Kenya. – Using FLUKE Ti 32 Thermo Imager. {October 2021}
  • 3) Portable Equipment Testing for SYNGENTA East Africa Limited offices, Located on Avenue 5 Building Wing A, Rose Avenue, 6th Floor, Nairobi, Kenya. – Tests carried out included: Insulation Resistance tests, Earth Continuity tests and Socket Outlets polarity tests. – using FLUKE 1654B and Socket Outlet Tester {April 2022}
  • 4) Energy Audit Study for Kilifi Mariakani Water and Sewerage Company Limited (KIMAWASCO). The study was conducted on several water pumping stations motor control panels and the KPLC mains incomer using: FLUKE 435 series 1 and 2, FLUKE 1734 and FLUKE 1748 Power Loggers. {April 2022 – May 2022}
  • 5) Energy Audit Study for Kwale Water and Sewerage Company Limited. The study was conducted on several water pumping stations motor control panels and the KPLC mains incomer using: FLUKE 435 series 1 and 2, FLUKE 1734 and FLUKE 1748 Power Loggers. {April 2022 – May 2022}
  • 6) Energy Audit Study for TAVEVO Water and Sewerage Company Limited. The study was conducted on several water pumping stations motor control panels and the KPLC mains incomer using: FLUKE 435 series 1 and 2, FLUKE 1734 and FLUKE 1748 Power Loggers. {April 2022 – May 2022}
  • 7) Energy Audit Study for CISCO Systems Management B.V Offices at Landmark Plaza 7th Floor, using: FLUKE 435 series 2, FLUKE 1734 and FLUKE 1748 Power Loggers. {June 2022}
  • 8) Energy Audit Study for University of Embu old administration block power house, using: FLUKE 435 series 2, FLUKE 1734 and FLUKE 1748 Power Loggers and FLUKE Ti32 thermo imager. {September 2022}
  • MECHANICAL, ELECTRICAL AND PLUMBING (MEP) SERVICES PROJECTS
  • 1) Proposed Residential Houses for Kakamega County Government.
  • Preliminary and detailed engineering (MEP) designs for the residential houses, preparatory school and clinic. {March 2019}
  • 2) Busega – Mpigi Expressway (2 x 23.7 Km) road project – Street Lighting and Toll Gate Plazas (Offices) {Uganda} (Design Review) {July 2019}
  • 3) Upgrading and landscaping of Kenyatta road (C565) – Mechanical, electrical and plumbing services for the social amenities which included: ablution blocks, shops, bus parks, stalls, weigh bridge stations and administration blocks, generator house and cafeteria. (Preliminary and Detailed Engineering Design and supervision) {March 2022 – ongoing}
  • 4) Second Kenya informal settlements improvement project (KISIP 2) project.
  • Engineering design review, packaging of detailed engineering designs and preparation of procurement documents: updating of RAP and ESIA reports; and supervision of the proposed infrustructures improvement works in selected informal settlements in the counties of Kisumu and Kakamega. (11 No. settlements) (Kisumu County: - Bandani, Kibuye, Manyatta – A, Manyatta – B, Muhoroni and Nyawita. Kakamega County: - Amalemba, Kambi Somali, Lukoye, Mjini and Shibale) {October 2022 – ongoing}
  • 5) Eastern Africa Regional Transport, Trade and Development Facilitation Project (EARTTDFP)
  • Consultancy services for detailed engineering MEP designs of the socio-economic infrastructure to the local communities in Turkana and West Pokot counties.
  • The facilities include:- schools, health centers, truck park areas and rest stops, ablution blocks, slaughter houses, butcheries and markets. {November 2022 – ongoing}

Related persons

ISSA ISAAKBusiness Development, Data Science, Design
Lizlent PettyAdministration, Management, Project Management
Evans KinyuaDesign and Build Lead at EvBanks
brandon kiptumEngineering