EOI/COOPI/NIG

COOPI is calling on all interested competent and duly established companies, suppliers and service providers in Kaduna, Katsina, Benue and Plateau State to participate in the 2025 - 2026 prequalification of supplier's exercise in any of the below-listed goods, services or works area(s)

 

Goods/Service/Work:


EOI -01 : Generator set - 30KVA -50HZ, 1500RPM, 3Phase, super... silent (Sound proof) including Transportation to COOPI office, installation and commissioning cost for Plateau, Benue, Kaduna and Katsina X 4
EOI - 02 : Complete Solar Set up (15 X 580 Watts Solar panels, 10kwh Felicity IVEM Hybrid Inverter, 15kwh Lithium Battery, Accessories (Change Over, Cables 10mm, Power Cable 6mm, Breaker, Surge Protector, Cable Lock, Iron Rail, Nails and Screws, Thunder Arrestor) labour and installation cost etc for Plateau, Benue, Kaduna and Katsina X 4
EO1 - 03 : Fire proof Cash Safe (Alloy steel) 5 cubic feet (Open/close by key only) for Plateau, Benue, Kaduna and Kastina X 4
EOI - 04 : Vehicle Hire (including fuel and driver) – Details provided in the quotation. This will be a framework agreement for 1 year. X 4


 

Evaluation Criteria:

 

Required documents for submission


Cover Page (Indicating category(s) of interest, related LOT number(s) 
Supplier Company profile with registered address(s) official email address and phone numbers of key personnel 
Evidence of registration with Corporate Affairs Commission 
TIN Registration number 
Evidence  of  possession  of  experience  in  the  line  business  you  are  applying  for, prospecting suppliers to provide at least copies of 2 PO(s) if any
Evidence of recent supplier Tax Clearance certificate for the year 2024, Evidence of financial capability, evidence of registration with professional organizations, regulatory bodies, if any, not mandatory etc.
 more
  • Procurement
  • Store-keeping
  • Supply Chain
Objectives of the Study The hydrological study seeks to:


Evaluate the hydrological characteristics of Potiskum LGA to determine water availability and flow patterns. Special coverage and detail to cover the three wards, Bare-Bare/Bauya/Lalai/Dumbulwa, Danchuwa/Bula, and Ngojin/ALlaraba.
Identify suitable sites for constructing half-moon structures for micro-water harvesting at community... levels.
Assess potential locations for macro-catchment dams to enhance water storage and recharge. iv. Analyze flood risks in degraded farmlands and grazing areas and recommend mitigation strategies.
Develop an integrated water management plan linking micro and macro water harvesting structures.
Inform the Catchment Level Water Harvesting


Construction of Dams and Reservoirs

Building small to medium-sized dams in strategic locations can help capture runoff during the rainy season. These reservoirs can store water for irrigation, livestock, and domestic use.

Key considerations include:


Site Selection: Identify suitable locations based on topography, soil type, and hydrology.
Community Involvement: Engage local communities in the planning and construction process to ensure ownership and sustainability.
Environmental Impact Assessment: Conduct assessments to minimize ecological disruption.


Watershed Management

Identify areas best situated for implementing integrated watershed management practices can enhance water quality and quantity.

This includes:


Reforestation: Planting trees and vegetation to reduce soil erosion and improve water retention.
Soil Conservation Techniques: Employing contour ploughing, terracing, and cover cropping to enhance soil health and reduce runoff.


Micro-catchment Level Water Harvesting

Identification of locations ideal for the construction of Micro-dams and Check Dams Micro-dams can be constructed in small valleys and depressions to capture and store rainwater.

Check dams can also be built along small streams to slow down water flow and promote infiltration.

Key steps include:


Design and Materials: Use locally available materials to construct durable and cost-effective structures.
Maintenance Plans: Establish community-led maintenance teams to ensure the longevity of these structures.


Scope of Work

The consultant(s) will undertake the following tasks:

Desk Review and Data Collection


Review existing hydrological, meteorological, and topographical data for Potiskum LGA.
Gather information on past flood events, erosion sites, and degraded lands.
Analyze satellite imagery and GIS data for watershed delineation.


Field Assessment and Site Identification


Conduct topographic and soil surveys to determine suitable sites for half-moon structures.
Identify potential locations for macro-catchment dams based on water flow accumulation, storage capacity, and community needs.
Assess flood-prone areas and propose mitigation measures (e.g., check dams, afforestation).


Hydrological and Flood Risk Analysis


Estimate surface runoff and water retention potential using rainfall data.
Model flood risks in degraded arable and pasture lands.
Evaluate groundwater recharge potential from proposed structures.


Community Engagement and Stakeholder Consultations


Conduct meetings with local farmers, herders, and community leaders to gather input on water needs and flood concerns.
Validate proposed sites for water harvesting structures with stakeholders.


Reporting and Recommendations


Prepare a hydrological assessment report with maps of proposed sites.
Provide design specifications for half-moon structures and catchment dams.
Recommend flood control measures and land restoration strategies.
Develop an implementation plan with cost estimates and timelines for 2025 and 2026.


Expected Deliverables


Inception Report (Work plan, methodology, and data sources).
Draft Hydrological Study Report (Preliminary findings and site assessments).
Final Comprehensive Report including:

Maps of proposed half-moon and dam sites
Flood risk zones and mitigation strategies.
Engineering designs and cost estimates.


Community Sensitization Materials (Simplified versions for local stakeholders).


Duration of Assignment

The study is expected to be completed within 6 weeks, including fieldwork, analysis, and reporting.

Qualifications of Consultant(s)


Advanced degree in Hydrology, Water Resources Engineering, Environmental Science, or related field.
Proven experience in watershed modelling, flood risk assessment, and water harvesting techniques.
Familiarity with GIS and remote sensing tools (e.g., ArcGIS, QGIS).
Previous work in Northern Nigeria’s semi-arid regions is an advantage.


Reporting and Supervision

The consultant will report to the Yobe State Ministry of Water Resources and collaborate with Potiskum LGA authorities, other programs doing similar work and COOPI project team.

Budget

A detailed budget should be submitted alongside the technical proposal, covering fieldwork, laboratory tests, equipment, and reporting.

Approval and Implementation The final report will be reviewed by the Yobe State Government and other stakeholders before implementation
 more
  • RFP
  • RFQ
  • EOI
Program 

COOPI NIGERIA PROGRAM IN YOBE – RESILIANCE AND COHESION - BMZ 

Contracting authority 

COOPI – Cooperazione Internazionale, is an Italian Non-Governmental Organization founded in Milan  in 1965. COOPI is present in Nigeria since 2014 implementing humanitarian projects. 

Description of the contract  


Supply of Improved Seeds, Fertilizer, and PICS Bags for Wet Season... Farming in Potiskum LGA 


LOTS 1 


Improved Millet Seed (SUPPER SOSAT) 5KG 
Improved Sorghum Seed (SAMSORG 45) 5KG 
Improved CowPea (5KG) 
Improved Groundnut Seed (SAMNUT 24) 5KG 


LOTS 2 


PICS Bags (2pcs) 
Fertilizers NPK 15,15 (25KG) 


Exclusion Clauses 

The  contracting  authority  will  exclude  from  participation  in  the  tender  procedure  candidates  or  tenderers  falling into any of the following cases: 


They  are  bankrupt  or  being  wound  up,  are  having  their  affairs  administered  by  the  courts,  have  entered into an arrangement with creditors, have suspended business activities, are the subject of  proceedings concerning those matters,  
They  have  been  convicted  of  an  offence  concerning  their  professional  conduct  by  a  judgement  that has the force of res judicata; 
They have been guilty of grave professional misconduct proven by any means that the contracting  authority can justify; 
They  have  not  fulfilled  obligations  relating  to  the  payment  of  social  security  contributions  or  the  payment  of  taxes  in  accordance  with  the  legal  provisions  of  the  country  in  which  they  are  established or with those of the country of the contracting authority or those of the country where  the  contract is to be performed; 
They have been the subject of a judgement that has the force of res judicata for fraud, corruption,  involvement in a criminal organisation or any other illegal activity; 
Following another procurement procedure or grant award procedure, they have been declared to  be in serious breach of contract for failure to comply with their contractual obligations. Candidates  or  tenderers  must  certify  by  any  relevant  means  that  they  are  not  in  one  of  the  situations  listed  above. 


Period of execution  

(1st July 2025 – 30th June 2026 with Possible Extension) 

Selection and award criteria 

The tender commission will not necessarily choose on the basis of lowest price alone but will award the  contract  on  the  basis  of  value  for  money,  price,  quality,  compliance  with  international  norms,  delivery 

period,  registration  certificates  (CAC,  SCUML,  TIN,  bank  statement  for  last  6  months  and  MUST  be  registered  member  with  National  Agricultural  Seed  council  (NASC)  in  LOT  1.  The  experience  of  the 

tenderer in the performance of similar contracts will be as well a criterion for selection.
 more
  • Agriculture
  • Agro-Allied